Scheduling

  1. Scheduling

    Lay production jobs out over time so machines and people aren’t overloaded and everything finishes on time.

  2. Recompute

    Recalculate the schedule after new jobs or changes — machines and people are laid out so nothing overloads.

  3. The Gantt chart

    Every job drawn on a timeline against its machine, so clashes and gaps are easy to spot.

  4. Each job

    One scheduled job with its planned start, end and the machine it runs on.

  5. The schedule

    Each row is a scheduled job with its start, end and the machine it runs on.